Defensible AI Workflows for the Enterprise

Enterprise Ready AI Presentations.

Presentations — and the workflows around them — brand-compliant, admin-controllable, and secure.

600+
Integrations
Salesforce. HubSpot. Gong. Snowflake.
SOC 2
Type II audited
Encrypted. Never trains on your data.
100%
On-brand
Every deck, every team, every time.
Steerco
100%
Atlas 04 / 09

Phase 3 · Implementation update

47
Sites operational +12 days ahead of plan

Phase 4 scoping kicked off after the Mar 18 executive sync with Marcus Chen. SCADA driver compatibility remains the critical-path blocker.

Signed Mar 22, 2026
4 / 9 Saved 9:48 AM
Slide 4 of 9
Fig. 01 Implementation Brief · Signed off, ready to ship Steerco Editor
The Three C's of Enterprise AI

Consistency. Control. Confidence.

01 — Consistency

Brand-compliant by default.

Templates, voice, and visual standards enforced on every deck.

02 — Control

Admin control, end to end.

Brand governance, RBAC, SSO/SAML. You decide what ships.

03 — Confidence

Secure to the board level.

SOC 2 Type II. Encrypted everywhere. Your data never trains a model.

The Problem — 01

Your team is already using consumer AI. That’s the problem.

Consumer AI ships drafts. The enterprise ships decks to customers, boards, and regulators — every claim challengeable.

01 — Inconsistent

Same prompt, six different decks.

02 — Untraceable

No source. No signature.

03 — Ungoverned

IT can’t see it, so IT can’t stop it.

The Steerco Workflow

Built in Steerco, end to end.

One platform. Five steps. Source to send.

Steerco QBR
100%
Atlas 04 / 09

Phase 3 · Implementation update

47
Sites operational +12 days ahead of plan

Phase 4 scoping kicked off after the Mar 18 executive sync with Marcus Chen. SCADA driver compatibility remains the critical-path blocker.

March 2026
Mixed
Mixed {{phase3.sitesLive}}
AI · phase3.narrative
Slide 4 of 9
Steerco

Get started

Pick a template to generate from a pre-built outline

Atlas Vol. IV · No. 01

Prepared for Rockwell Automation

Quarterly BusinessReview

March 2026
10 slides
QBR
Atlas Vol. I · No. 04

Prepared for Atlas Logistics

Annual BoardReview

March 2026
6 slides
Board Deck
Atlas Vol. II · No. 03

Prepared for Hartwell Bancorp

RenewalProposal

March 2026
6 slides
Renewal
Atlas Vol. III · No. 02

Prepared for Meridian Health

Q1 OperatingReview

March 2026
4 slides
Board Deck 2
Steerco
100%
Atlas 04 / 09

Phase 3 · Implementation update

47
Sites operational +12 days ahead of plan

Phase 4 scoping kicked off after the Mar 18 executive sync with Marcus Chen. SCADA driver compatibility remains the critical-path blocker.

March 2026
4 / 9 Saved 9:48 AM
Slide 4 of 9
Cited on Slide 4

Phase 3 — Sites Live

47 of 165 operational Salesforce synced 2m ago
47
/ 165 sites
+18 this week · +12 days ahead of plan
30 days ago today
Cleveland — Plant 7
Live Mar 25
Salesforce
Milwaukee — Distribution Hub
Live Mar 24
Salesforce
Mayfield Heights — HQ
Live Mar 22
Salesforce
Twinsburg — Operations
Cutting over Mar 21
Salesforce
Mequon — Plant 12
Live Mar 20
Salesforce
Akron — Logistics Center
Live Mar 19
Salesforce
Strongsville — R&D Annex
Cutting over Mar 18
Salesforce
Twin Falls — Plant 9
Live Mar 18
Salesforce
Cited on Slide 4

Phase 3 — Sites Live

47 of 165 operational Salesforce synced 2m ago
47
/ 165 sites
+18 this week · +12 days ahead of plan
30 days ago today
Cleveland — Plant 7
Live Mar 25
Salesforce
Milwaukee — Distribution Hub
Live Mar 24
Salesforce
Mayfield Heights — HQ
Live Mar 22
Salesforce
Twinsburg — Operations
Cutting over Mar 21
Salesforce
Mequon — Plant 12
Live Mar 20
Salesforce
Akron — Logistics Center
Live Mar 19
Salesforce
Strongsville — R&D Annex
Cutting over Mar 18
Salesforce
Twin Falls — Plant 9
Live Mar 18
Salesforce
Steerco
100%
Atlas 04 / 09

Phase 3 · Implementation update

47
Sites operational +12 days ahead of plan

Phase 4 scoping kicked off after the Mar 18 executive sync with Marcus Chen. SCADA driver compatibility remains the critical-path blocker.

Signed Mar 22, 2026
4 / 9 Saved 9:48 AM
Slide 4 of 9

Wire up your stack.

Salesforce, HubSpot, Gong, Snowflake — every claim traces back to its source.

Author the template.

Lock what should stay consistent. Bind each slot to its source. Let AI rewrite only what you choose.

Pick a brand-locked template.

QBR, board, renewal. On-brand from slide one. Fonts, logos, color locked.

Steerco generates the deck.

Every number sourced. Drill any KPI down to the row-level data behind it.

Approved. On the record.

Reviewed, signed, and logged. Every edit attributed before the deck ships.

Use Cases

One source of truth. Three lenses.

One deck. One canvas. Every reviewer gets the proof they need — without losing the deck.

01
For the executive who clicks the number

Every KPI drills to the row-level Salesforce record behind it.

Source: Salesforce
Steerco
100%
Atlas 04 / 09

Phase 3 · Implementation update

47
Sites operational +12 days ahead of plan

Phase 4 scoping kicked off after the Mar 18 executive sync with Marcus Chen. SCADA driver compatibility remains the critical-path blocker.

March 2026
4 / 9 Saved 9:48 AM
Slide 4 of 9
Cited on Slide 4

Phase 3 — Sites Live

47 of 165 operational Salesforce synced 2m ago
47
/ 165 sites
+18 this week · +12 days ahead of plan
30 days ago today
Cleveland — Plant 7
Live Mar 25
Salesforce
Milwaukee — Distribution Hub
Live Mar 24
Salesforce
Mayfield Heights — HQ
Live Mar 22
Salesforce
Twinsburg — Operations
Cutting over Mar 21
Salesforce
Mequon — Plant 12
Live Mar 20
Salesforce
Akron — Logistics Center
Live Mar 19
Salesforce
Strongsville — R&D Annex
Cutting over Mar 18
Salesforce
Twin Falls — Plant 9
Live Mar 18
Salesforce
Cited on Slide 4

Phase 3 — Sites Live

47 of 165 operational Salesforce synced 2m ago
47
/ 165 sites
+18 this week · +12 days ahead of plan
30 days ago today
Cleveland — Plant 7
Live Mar 25
Salesforce
Milwaukee — Distribution Hub
Live Mar 24
Salesforce
Mayfield Heights — HQ
Live Mar 22
Salesforce
Twinsburg — Operations
Cutting over Mar 21
Salesforce
Mequon — Plant 12
Live Mar 20
Salesforce
Akron — Logistics Center
Live Mar 19
Salesforce
Strongsville — R&D Annex
Cutting over Mar 18
Salesforce
Twin Falls — Plant 9
Live Mar 18
Salesforce
02
For the room asking “where did this come from?”

Citations link straight to the original Gong call or transcript.

Source: Gong
Steerco
100%
Atlas 04 / 09

Phase 3 · Implementation update

47
Sites operational +12 days ahead of plan

Phase 4 scoping started after Mar 18 executive sync with Marcus Chen. SCADA driver compatibility remains the critical-path blocker at Rockwell Automation.

March 2026
4 / 9 Saved 9:48 AM
Slide 4 of 9
Cited on Slide 4
Rockwell Automation · Executive Sync

Rockwell CFO Sync — Q1 Implementation Risks

Mar 18, 2026 · 11:00 AM PT 38 min 4 participants
Recorded call Gong Gong Salesforce Logged on Rockwell Automation
Gong takeaway

CFO Marcus Chen flagged a Phase 3 budget overrun as a board-level escalation. Atlas committed to a dedicated Solutions Engineer for SCADA remediation and a monthly executive sync with engineering leadership.

Transcript · jumped to 08:14

Marcus Chen CFO, Rockwell Automation 00:08:14

The Phase 3 budget overrun is now a board-level question. We can't sign off on the next milestone until we see a recovery plan.

Daniela Park CSM, Atlas 00:08:42

Understood. We're assigning a dedicated Solutions Engineer to your SCADA team this week — they'll lead OT remediation and report to your VP of Operations.

Source for slide text
Gong Transcribed by Gong · indexed 18 days ago
Cited on Slide 4
Rockwell Automation · Executive Sync

Rockwell CFO Sync — Q1 Implementation Risks

Mar 18, 2026 · 11:00 AM PT 38 min 4 participants
Recorded call Gong Gong Salesforce Logged on Rockwell Automation
Gong takeaway

CFO Marcus Chen flagged a Phase 3 budget overrun as a board-level escalation. Atlas committed to a dedicated Solutions Engineer for SCADA remediation and a monthly executive sync with engineering leadership.

Transcript · jumped to 08:14

Marcus Chen CFO, Rockwell Automation 00:08:14

The Phase 3 budget overrun is now a board-level question. We can't sign off on the next milestone until we see a recovery plan.

Daniela Park CSM, Atlas 00:08:42

Understood. We're assigning a dedicated Solutions Engineer to your SCADA team this week — they'll lead OT remediation and report to your VP of Operations.

Source for slide text
Gong Transcribed by Gong · indexed 18 days ago
03
For the approver

Sign-off chain attached. Every edit attributed before the deck ships.

Approved & signed
Steerco
100%
Atlas 04 / 09

Phase 3 · Implementation update

47
Sites operational +12 days ahead of plan

Phase 4 scoping kicked off after the Mar 18 executive sync with Marcus Chen. SCADA driver compatibility remains the critical-path blocker.

Signed Mar 22, 2026
4 / 9 Saved 9:48 AM
Slide 4 of 9
What Goes Into Every Deck

Four steps machines do better. One step only humans should.

01 STEERCO

Data Tracing

Pull live data. Link every number to source.

02 STEERCO

Analysis

Cross-reference. Flag variances. Surface what matters.

03 STEERCO

Narrative

Build the story. Every claim still linked.

04 STEERCO

Brand & Approval

On-brand. Routed. Signed before it ships.

05 YOU

Your Review

Review. Approve. Send.

Automated by Steerco
Where you belong
Beyond the Deck

The deck is just one step. Steerco runs the rest.

Decks live inside workflows. The same canvas composes triggers, agents, and actions — for sales, marketing, ops, and finance — under one governance layer.

AGENT
Personalization Agent
Identifies visitor segment from HubSpot archetype, UTM, or browsing pattern. Serves role-specific product recommendations, project imagery, and content. Learns weekly from conversion data.
78 / 142 records
OT Manager
35
Plant CIO
28
Procurement
15
Triggered Mon, Mar 22 · 9:00 AM · ~38s / batch
Mon, Mar 15 138 records · 3 segments
Mon, Mar 8 142 records · 3 segments
Mon, Mar 1 134 records · 4 segments
  1. 01 / Trigger
  2. 02 / Personalize
  3. 03 / Score intent
  4. 04 / Specify
  5. 05 / Activate
Trusted by GTM teams

Teams that tried consumer AI first — and came back.

Selected customers07 clients
  • Branch 49
  • Liquified Solutions
  • Deepvest AI
  • Model N
  • Chakra Consulting
  • Swiftly
  • Creative Mines
“Steerco has completely changed how Branch49 interacts with our clients.”
John Darby
COO, Branch49
Two teammates collaborating at a laptop in an early-stage startup workspace
Why we built Steerco

Speed is the new moat. We refuse to trade it for trust.

The cadence most companies run on — quarterly boards, weekly syncs, Sunday-night slide prep — was built when information was scarce. It isn't anymore.

Consumer AI showed teams what speed feels like — but not what trust costs. So teams default back to manual prep, and the gap between what they decide and what they ship widens every quarter.

Steerco closes that gap. The teams that figure this out first get the next decade. We built Steerco for them.

ZH
Zach Hawley
Co-Founder & CEO, Steerco
The Numbers

What’s the cost of one indefensible AI deck?

Not just the hours. The churn risk when a customer challenges a number. The audit risk when compliance asks. The reputational risk when a board member does.

Calculate My ROI
Risk-Adjusted Snapshot 250 ppl · $25M ARR
Cost of indefensible deck prep
$480K/yr
Steerco Defensible tier
$50K/yr
Net annual return $430K

See it on your data.

Bring one account. We'll connect your stack, generate a deck, and show you the lineage on every number — live, in 15 minutes.